Concrete Spillway Modification and Obermeyer Gate Installation

Tallassee, Alabama

We are currently replacing the existing Thurlow Dam spillway gates, which were installed in the 1920s. Replacing these flashboard spillway gates with a new Obermeyer inflatable gate system will allow for better water resource management. Read more

Coosa River Dams Aeration Project

Ohatchee, Alabama

The Coosa River Dams Aeration Project included installation of new aeration systems for three dams: Weiss, Neely Henry, and Logan Martin. Three units were installed at each dam. The project included civil, structural, electrical, and... Read more

Goat Rock Dam Turbine Installation

Smith's Station, Alabama

The project included extensive powerhouse modifications at Georgia Power Company’s Goat Rock Dam to accommodate two new horizontal bulb-type turbines, generators, and associated equipment. This work included setting new downstream stop... Read more

Lake Martin Dam Arch Replacement

Lake Martin, Alabama

The project consisted of the replacement of 20 bays of concrete arches on the Lake Martin Dam, which included 3 arches per bay for a total of 60 arches. In addition to the complex arch concrete removal and replacement, the project included... Read more

Logan Martin Dam Forebay Oxygen Diffuser System

Vincent, Alabama

The liquid oxygen diffuser system, part of the Coosa River Dams Aeration project, was a secondary aeration system installed on the forebay side of the dam at Logan Martin. The diffuser system includes seven diffusers extending upstream of... Read more

Martin Dam Powerhouse Crane Structure Rehabilitation

Tallahassee, Alabama

At the Martin Dam, the existing 200-ton crane was scheduled to be replaced. However, the existing crane structure was insufficient to support the new crane loads. Our team rehabilitated the existing crane structure in order to install the... Read more

North Carolina Hydropower Station Spillway Modification

Lilesville, North Carolina

Located at a hydroelectric power station, this project included modifications to the spillway crest, an addition of post-tensioned rock anchors, and replacement of spillway flashboards with pneumatically operated gates. It also included... Read more

North Carolina Hydropower Station Upstream Fish Passage

Lilesville, North Carolina

This project will enable fish to swim upstream past the hydro station powerhouse and spillway during their spawning season. The project consists of a new fish lift tower and hopper elevator system, reinforced concrete tailrace entrance... Read more

Upstate South Carolina Minimum and Recreational Flow

Upstate South Carolina, South Carolina

The project includes improvements to two diversion dam structures that create a reservoir in upstate South Carolina. The creation of an in-river recreational whitewater area downstream of the Long Bypass Reach (LBR) diversion dam is one of... Read more

Wallace Dam Forebay Oxygenation System

Sparta, Georgia

This project’s goal was to increase the overall dissolved oxygen in the discharged water from the trail race to meet the Federal Energy Regulatory Commission’s required 4.0mg/L standard during hydroelectric generation. This was... Read more