Health Sciences Research Building at Emory University
This research hub works closely with Children’s Healthcare of Atlanta and the Emory Children’s Centers to bridge the gap between research and results for children’s healthcare. It includes a wet laboratory building with research labs focused on pediatric, cancer, and drug research, as well as a Biosafety Level 3 laboratory…
Qpix
Another addition to North Carolina’s growing Research Triangle Park, this lab space is dedicated to advancing dental imaging technologies. The facility includes essential features like fume hoods, laboratory benches, a dry room, an International Standards Organization 7 clean room, as well as critical components like an air curtain and air…

Plant Hammond Wet Flue Gas Desulfurization
Before it was retired in 2019, Plant Hammond provided electricity to citizens of Georgia through four coal-fired units capable of producing up to 800 MW. For the plant’s desulphurization project, Brasfield & Gorrie installed concrete foundations, embedded electrical, site grading, site paving, storm piping, and epoxy linings. This build was…
Plant Miller
Since 2006, our team has completed several projects for Plant Miller, including a wastewater management system, a two-span entrance bridge, a gypsum dewatering facility, limestone silos, and much more. With four generating units and a total capacity of 2,640,000 kW, this coal plant is a crucial component of…
Plant Miller Bottom Ash Conversion Civil Package
Brasfield & Gorrie has completed several projects for Plant Miller since 2006 to provide reliable energy for Central Alabama. This build provided a showcase for our self-perform capabilities as our craft workers constructed several types of shoring systems. Because the ash silo foundation was located directly in the middle of…
Plant Stanton Combined Cycle Unit B Underground and Foundation Package
This project was one of six complementary builds for Plant Stanton that broke ground within the span of a year. Initially intended to be an integrated gasification combined cycle plant, the facility shifted to burning natural gas due to government and environmental restrictions. Brasfield & Gorrie self-performed all site work…
Plant Wansley Limestone Unloading and Handling
After providing numerous additions to the Hal B. Wansley Power Plant in 2000, Brasfield & Gorrie was selected years later to design-build a limestone unloading and handling and reclaim system for the facility. The plant receives 6,000 tons of limestone by train every 2-3 days, and this new award-winning system…
Plant Wansley Units 6 and 7
For the first of multiple projects with Plant Wansley, we installed concrete foundations, underground electrical, and underground mechanical for a 1,000 megawatt combined cycle power plant. Brasfield & Gorrie was brought in as a trade contractor by The Industrial Company (TIC), who was awarded the above-ground contract, at the client’s…
Upper Coosa River Dams Aeration Project
When federal regulations required a dramatic improvement in water quality for fish and other aquatic species on the Coosa River, Brasfield & Gorrie was brought in to work on three separate facilities: Weiss Dam, Neely Henry Dam, and Logan Martin Dam. Each structure required different civil, structural, electrical, and mechanical…
Upstate South Carolina Minimum and Recreational Flow
As one of the few of its kind nationwide, the in-river recreational whitewater area downstream from the Long Bypass Reach is a catalyst for economic development that benefits its surrounding area. To create this new feature, our team installed unique concrete structures to train and direct the water through a…