How We Saved $25 Million and Six Months

July 21, 2020

Modern multi-story office building with large windows and a landscaped entrance.

Moses Cone Women’s and Children’s Addition

Brasfield & Gorrie’s Cone Health Women’s and Children’s Center at Moses Cone Hospital project was delivered using an integrated project delivery (IPD) contract and Lean methods. The six-floor, 197,000 sq ft facility was delivered for $25 million less than the original budget and six months ahead of schedule. This project is a striking example of the benefits of IPD and the principles that are critical for IPD success.

The Cone Health Women’s and Children’s Center project showcased the best of what IPD can be. The relationships between partners were critical in maximizing expertise and creating efficiencies from the start. The project’s time and cost savings resulted from the strength of the team and the delivery method, and Cone Health is building its next IPD project with many of the same team members.

Mount Sinai Medical Center reaches topping out milestone for new Westchester emergency and specialty care facility

November 24, 2025

A person in a safety vest and hard hat signs a concrete wall covered with signatures at the future Westchester emergency care and specialty care facility construction site.

Brasfield & Gorrie tops out bed tower at Ascension Seton Williamson

August 21, 2025

Aerial view of a hospital with a large parking lot, adjacent to a building under construction with a red crane, surrounded by green fields and other buildings.

Modern Healthcare names Brasfield & Gorrie the nation’s top general contractor for healthcare construction

June 17, 2025

A modern glass-fronted hospital building labeled “Children’s” is shown at sunset, with landscaped grounds and adjacent parking areas.