fbpx

Highway 150 Bridge Replacement Over Shades Creek and CSX

Hoover, Alabama

Client:
Alabama Department of Transportation

This project widened and improved the intersection at Highway 150 near Ross Bridge Parkway and replaced two existing bridges over Shades Creek and CSX Railroad with a single 941-foot-long, 90-foot-wide bridge. The new bridge is a multi-stem bent cast-in-place substructure founded on drilled shafts with 10 prestressed concrete girder simple spans and a cast-in-place concrete deck.

The scope of work also included significant grading, drainage, and sanitary sewer packages in addition to the roadway and signal work. Brasfield & Gorrie self-performed all traffic control, H-pile driving, bridge concrete, prestressed concrete girder erection, and bridge demolition.