Skip to Content

Project Zeus

Feb 2024

Project Zeus includes five Tier III data centers on a greenfield site. The first two buildings each include four 7 MW data halls and one 8 MW network for a total of 36 MW per building. Each of the third, fourth, and fifth building includes three data halls that total 36 MW. The project also includes 195 acres of site preparation and underground utilities for the final five buildings.

  • Total building: 250,000 sq ft total each
  • White space: 36 MW per building
  • Tier level: III
  • Total critical IT load: 180 MW
  • Type: Greenfield hyperscale

Client

Confidential