James B. Messerly Water Pollution Control Plant

When it came time to upgrade the James B. Messerly Water Pollution Control Plant, the project was divided into two main components. The existing plant needed structural modifications as well as some new additions, but the heavier lift was the construction of four new aeration basins on an adjacent plot of vacant land. Because the site was adjacent to the Phizney Swamp, our team also installed 34 deep wells around the excavation.

Client

Parsons Water & Infrastructure, Inc.

Project Stats

22,000 cubic yards of concrete, 16,000 linear feet of ductile iron