Lexington Medical Center Central Utility Building
West Columbia, South Carolina
Client:
Lexington Medical Center
Project Size:
64,0000 sq ft
The Lexington Medical Center Central Utility Building is a 64,000 sq ft building containing:
- 4,200 tons of chilled water with the ability to add another 2,400 tons
- 800 tons of low-temperature chilled water
- 1,300 hp steam boiler plant with the ability to add another 650 hp
- 4,160 V x 4,000 A electrical services to campus
- Three 2 MW x 4,160 V emergency generators with the ability to add three more