Archive
Rinnai Project Poseidon
Based in Nagoya, Japan, the Rinnai Corporation has risen to become the top provider of tankless water heaters in North America. Brasfield & Gorrie was commissioned to build a new facility capable of supporting the company’s growing production needs including manufacturing and warehouse space, Class A office amenities, and conference…
Topre America Stamping Plant Expansion
The Japanese-based Topre Corporation built a new manufacturing facility in Central Tennessee in 2015—and quickly realized that they needed to expand their operations even further. Brasfield & Gorrie stepped in just two years after the initial build to provide three additional phases of construction for the existing plant. Our team…

Aleris Cold Mill
A global leader in the aerospace, automotive, rail, and trucking industries, Aleris has been operating out of a 1.6 million sq ft mill in Northwest Kentucky since 1966. When they were ready to expand their campus half a century later, Brasfield & Gorrie answered the call to expand an existing…

ACIPCO Steel Pipe Processing Facility
This 124,000 sq ft design-build processing facility is a conventional steel structure with metal siding and roofing. The facility features catwalks and an overhead crane installed along the full length of the building. Multiple rail spurs for transporting materials and finished product to and from the facility are also included.

Chart Industries Manufacturing Plant
Chart Industries Manufacturing Plant is a 127,000 sq ft manufacturing facility that includes 122,000 sq ft of manufacturing space and 5,000 sq ft of office space. Brasfield & Gorrie is using a hybrid pre-engineered metal building that includes low and high bay sections. The facility will include six interior cranes…
BorgWarner EV Expansion
BorgWarner EV Expansion is a 12,000 sq ft building addition to an existing manufacturing plant. The project includes two loading dock locations that will serve the EV battery assembly process. It also houses five overhead bridge cranes that will move the battery modules. Brasfield & Gorrie completed Phase 1 of…

Schneider Electric
Schneider Electric Manufacturing Facility is a 103,000 sq ft design-build facility with offices for staff; a production area where the power center material is delivered, assembled, tested, and shipped; warehouse area for the storage of material and minor cutting/welding/modification of parts needed for fabrication of the power centers; and UPS…

Amazon Last Mile Facility DBM5
After our first build for Amazon’s Last Mile team was a success, we continued to strengthen our client relationship with a new facility just a state away. This project scope included demolition of four existing warehouses along with extensive site work and improvements to support the construction of a new…
Amazon Last Mile Facility DSR8
Project scope on this facility includes demolition of four existing warehouses, extensive site work and improvements, and construction of a new 128,000 sq ft fulfillment center for Amazon.
Prologis Riverwest III
Located on 80 acres, Prologis Riverwest III includes a 1.1 million sq ft tilt-up, a cross-dock distribution center with 40 ft clear height, speculative office space, and a 216-space loading dock for trucks.