• Infrastructure

Infrastructure Expert Speaks at Accelerated Bridge Construction Conferences

November 15, 2020

Project Manager Kevin Kane recently presented at two major international bridge conferences. During the International Accelerated Bridge Construction Conference and the International Bridge Conference, Kevin discussed the rapid replacement of the CSX Bayou Sara Bridge swing span in Mobile, Alabama.

Kevin shares more about this accelerated bridge construction success story in this blog post: An Accelerated Bridge Construction Success Story: CSX Bayou Sara Swing Span Replacement.

No-cost training available in Alabama for construction jobs

March 4, 2026

Close-up of a blue Studson safety helmet with Brasfield & Gorrie branding, showing its ventilation slits and part of the wearer’s head.

Brasfield & Gorrie Honored with Four National Excellence in Construction Awards

March 17, 2023

A collage of four different modern architectural structures, featuring an interior space, a stadium, a landscape with buildings honored at the National Excellence in Construction Awards, and the entrance to a contemporary facility.

Award Spotlight: Seven Projects Honored by Trade Publications

December 9, 2021

Enr regional best projects banner with a collage of construction and architecture images in the background.