• Science and technology

Leveraging BIM and Design-Assist Through COVID-19

March 4, 2022

Life sciences lab

This laboratory and research facility in North Carolina’s Research Triangle Park uses cutting-edge technology to maximize detectable results from a single blood draw, revolutionizing potential treatments through early recognition and intervention. Supporting that mission by building this state-of-the-art lab required overcoming an aggressive schedule and procurement challenges caused by the COVID-19 pandemic. Brasfield & Gorrie used two key strategies to increase speed-to-market for this transformative project: Building Information Modeling (BIM) and a design-assist approach.

Accomplishing this amount of work in 5.5 months is a massive undertaking for a laboratory buildout.

With both the latest in innovative virtual design and construction capabilities and strong relationships with local trades, Brasfield & Gorrie is poised to outperform our competitors on even the most demanding jobs, making early and cost-effective decisions that add long-term value to your project.

Oops! We could not locate your form.

Brasfield & Gorrie reaches construction milestone on Southern Research project

April 18, 2024

Construction workers in safety gear celebrating over lunch at tables inside a partially completed building

Southern Research opens biotech incubator, built by Brasfield & Gorrie

February 16, 2024

A group of eight people, men and women, stand behind a ceremonial ribbon with scissors in hand, ready for a ribbon cutting.

Discovery Life Sciences Global Headquarters Opens in North Alabama

October 13, 2023

Modern laboratory in North Alabama with workstations, equipment, and cabinets under bright lighting.