fbpx

Leveraging BIM and Design-Assist Through COVID-19

March 4, 2022

Life sciences lab

This laboratory and research facility in North Carolina’s Research Triangle Park uses cutting-edge technology to maximize detectable results from a single blood draw, revolutionizing potential treatments through early recognition and intervention. Supporting that mission by building this state-of-the-art lab required overcoming an aggressive schedule and procurement challenges caused by the COVID-19 pandemic. Brasfield & Gorrie used two key strategies to increase speed-to-market for this transformative project: Building Information Modeling (BIM) and a design-assist approach.

Accomplishing this amount of work in 5.5 months is a massive undertaking for a laboratory buildout.

With both the latest in innovative virtual design and construction capabilities and strong relationships with local trades, Brasfield & Gorrie is poised to outperform our competitors on even the most demanding jobs, making early and cost-effective decisions that add long-term value to your project.

Download Full Case Study


Fill out the form to download a case study on the use of Building Information Modeling and a design-assist approach on this laboratory and research facility.