Bull Slough Bridge

Tuscaloosa, Alabama

Client:
Alabama Department of Transportation

Project Size:
Four-span bridge; 414 cu yd of concrete

The Bull Slough Bridge project included demolition and reconstruction of a 280-foot bridge on Bull Slough Road across the North River. The work had to be completed in 80 days due to the loss of access for homeowners. The scope of work consisted of three intermediate bents on six drilled shafts in 30 feet of water, one abutment on steel piling, one abutment on drilled shafts, and a 280-foot-long bridge deck.