ACIPCO Steel Pipe Processing Facility

Birmingham, Alabama

This 124,000 sq ft design-build processing facility is a conventional steel structure with metal siding and roofing. The facility features catwalks and an overhead crane installed along the full length of the building. Multiple rail spurs... Read more

Aleris Cold Mill

Lewisport, Kentucky

Brasfield & Gorrie’s scope of work for this project included multiple concrete foundation packages for Aleris’ Cold Mill Facility. The Cold Mill Phase 2 package included concrete foundations for the expansion of an existing... Read more

American Cast Iron & Pipe Company

Birmingham, Alabama

This 106,000 sq ft design-build project for American Cast Iron Pipe Company (ACIPCO) consisted of construction of three pre-engineered metal buildings and site improvements at ACIPCO’s Vulcan Painters Facility. Prior to this project,... Read more

Hannah Steel Mill Addition

Tuscaloosa, Alabama

The design-build, pre-engineered Hanna Steel Mill expansion added 144,000 sq ft to the existing facility that was originally built in 1991. The additional manufacturing line connects to three sides (and three previous expansions) of the... Read more

Kloeckner Metals

Calvert, Alabama

Kloeckner Metals is one of the leading metal distributors in North America. This design-build project includes 87,500 sq ft of processing and coil storage bays as well as 5,500 sq ft of office space. Constructed on a 16-acre greenfield... Read more

Southern Blanking Steel Processing Facility and Expansion

Columbia, Tennessee

Brasfield & Gorrie was awarded both the new steel processing facility and an expansion to this facility. The first project was the construction of a new 108,531 sq ft steel processing facility, including a blanking line, office... Read more

Southland Tube, Inc.

Birmingham, Alabama

The 78,000 sq ft Mill 4 Expansion was a design-build project that included all site/facility planning, design phase activities, construction work, and process equipment coordination. Sixty-five percent of the work was self-performed. The... Read more

Topre America Stamping Plant Expansion

Smyrna, Tennessee

The Topre Stamping Plant project is a three-phase, single-story, 143,735 sq ft expansion that provides automotive stamping and body structure assemblies for Nissan, Honda, and Toyota. We also constructed a 53,230 sq ft stand-alone... Read more