fbpx

Project Library

Use the tools below to search our library of select projects.

Search projects

Showing 1 - 12 projects from total 19 result(s)

grid list

Airbus

Mobile, Alabama

Brasfield & Gorrie was awarded three projects for Airbus at the Brookley Aeroplex in Mobile, Alabama: the A320 Final Assembly Line (FAL) Piling and Foundations, the Central Utility Plant, and Package A. The FAL Piling and Foundations... Read more

Airbus A220 Final Assembly Line and Logistics Center Expansion

Mobile, Alabama

The design-build Airbus A220 Assembly Line and Logistics Center Expansion is a 205,000 sq ft high-bay structural steel airplane assembly facility including basements, tunnels, manufacturing space, and administrative spaces. The logistics... Read more

Airbus A320 Dual Bay Assembly Hangar 24

Mobile, Alabama

This 94,000 sq ft, high-bay, structural steel, A320 dual bay hangar facility for Airbus is seeking LEED Silver certification. The project is a progressive design-build effort that consists of two A320 hangar bays, a fire foam containment... Read more

Airbus Central Utility Plant

Mobile, Alabama

This design-build project included a power house and utility plant to feed the Airbus campus for manufacturing of the A321 aircraft at the Mobile Aeroplex at Brookley. Utilities included potable water, fire protection water, sanitary... Read more

Airbus Dual Bay Assembly Hangar 25

Mobile , Alabama

This design-build, high-bay, structural steel, dual-bay hangar facility consists of a fire foam containment tank, all associated site utilities, aprons, taxiways, and a two-story administrative annex. The annex is comprised of offices,... Read more

Birmingham-Shuttlesworth International Airport Terminal Modernization

Birmingham, Alabama

The Birmingham-Shuttlesworth International Airport Terminal Modernization entailed 220,359 sq ft of new construction and 291,135 sq ft of renovation to a two-story terminal, concourses, ticketing halls, office spaces, ramp operations, and... Read more

Confidential Client – Missile Integration Facility

Confidential, Alabama

The Missile Integration Facility is a 70,000 sq ft, fully automated, high-bay missile manufacturing facility that consists of a missile assembly facility, office support area, and two missile test cells. The building was constructed of... Read more

Confidential Client – Radar Operations Center

Confidential, Mississippi

This new 60,000 sq ft facility serves as a highly automated hub for radar research, production, and testing. The building has administrative space for 120 employees, radar research/manufacturing space, and radar testing chambers. The... Read more

Confidential Client 809 Clean Room Expansion

Confidential, Arizona

The 809 Clean Room Expansion renovated existing office space into a state-of-the-art clean room and research space for assembly of exoatmospheric kill vehicles (EKV). The first-floor build-out included 600 sq ft of ISO Class 5, 7, and 8... Read more

GE Aviation Aircraft Engine Production Facility

Lafayette, Indiana

This design-build manufacturing and assembly facility for GE Aviation included manufacturing, assembly (engine and engine core), and office space. The 309,000 sq ft facility supports the production of CFM International LEAP engines, which... Read more

GE Aviation Manufacturing Facility Expansion

Hooksett, New Hampshire

This design-build 55,000 sq ft addition to an existing manufacturing building consisted of a single-story high-bay expansion that increased the manufacturing space by one-third. The expansion added an office area, a wastewater treatment... Read more

Lockheed Martin

East Camden, Arkansas; Unincorporated Orange County, Florida; and Orlando, Florida

The Lockheed Martin PAC-3 AUR II Missile Coating Building in East Camden, Arkansas, is a 76,000 sq ft project consisting of a main production building and a separate break room connected by a breezeway. The building is used for missile... Read more