1150 White Street Upgrade
Atlanta, Georgia
1150 White Street Upgrade consists of 7.5 MW of uninterrupted power supply capacity and 12.5 MW of generator capacity to support a new 36,000 sq ft data hall. Read more
Adtran Data Center Renovations
Huntsville, Alabama
The Adtran Data Center renovation included upgrades to two Tier II data centers located on campus. The work was performed in a live data center environment, and the project was completed without disruption to the operations of the center.... Read more
AdventHealth Mission Control
Orlando, Florida
Advent Health Mission Control is 12,000 sq ft command center using artificial intelligence to help ensure efficient patient care across nine Central Florida hospitals. This high-tech center is staffed 24 hours a day, seven days a week by a... Read more
Airbus Central Utility Plant
Mobile, Alabama
This design-build project included a power house and utility plant to feed the Airbus campus for manufacturing of the A321 aircraft at the Mobile Aeroplex at Brookley. Utilities included potable water, fire protection water, sanitary... Read more
Alfa Business Processing Recovery Center
Montgomery, Alabama
The Alfa Insurance Business Processing Center/Recovery Center is the second major addition constructed by Brasfield & Gorrie at Alfa’s main campus. The Tier III, 134,095 sq ft facility is separated by a four-hour wall between the... Read more
Allstate Office Building and Call Center
Roanoke, Virginia
This design-build project includes a three-story build-to-suit office building and a 500-car surface-level parking area. The 75,000 sq ft building is Allstate’s new claims call center, which houses approximately 500 employees. Each floor... Read more
Asurion Nashville Data Center Expansion
Nashville, Tennessee
This project expanded the existing data center by 1,250 sq ft and increased the data center capacity by 200 kW, upgrading the facility to a Tier III rating. The expansion included a network operations center, a new 450 kW UPS system... Read more
ATL-DC2 and ATL-DC2 Expansion Data Hall Build-outs
Atlanta, Georgia
This project includes nine 6 MW data hall build-outs. Eight of these total 25,000 sq ft with the ninth adding 50,000 sq ft. Each build-out took five to eight months to complete. Read more
ATL1 Data Center Phase 1 Upgrade
Suwanee, Georgia
ATL1 Phase 1 consists of the addition of 2 MW of critical capacity and 12,000 sq ft of white space adjacent to an existing data center. In addition to the new data center expansion, the project also includes the remodeling of existing... Read more
Atlanta Data Center (ATL-DC2)
Atlanta, Georgia
Total building: Two-story, 340,000 sq ft data center on 6.1 acres, including demolition and site work White space: 200,000 sq ft, including a 20,000 sq ft, 6 MW data center build-out with the deployment of busway power distribution, ladder... Read more
Atlanta Data Center (ATL-DC2) Expansion
Atlanta, Georgia
This 170,000 sq ft, Tier III, two-story data center expansion features 100,000 sq ft of white space, a 200 W/sq ft density, 2N redundancy, and a total critical IT load of 24 MW. Read more
AUBix Data Center
Auburn, Alabama
Total building: One-story, 40,000 sq ft greenfield data center with a precast structure and veneer on a six-acre site. White space: 22,000 sq ft Tier level: III Density: 140 W per sq ft Total critical I.T. load: 4 MW Redundancy: N+1 Read more