ACIPCO Steel Pipe Processing Facility
Birmingham, Alabama
This 124,000 sq ft design-build processing facility is a conventional steel structure with metal siding and roofing. The facility features catwalks and an overhead crane installed along the full length of the building. Multiple rail spurs... Read more
Aleris Cold Mill
Lewisport, Kentucky
Brasfield & Gorrie’s scope of work for this project included multiple concrete foundation packages for Aleris’ Cold Mill Facility. The Cold Mill Phase 2 package included concrete foundations for the expansion of an existing... Read more
American Cast Iron & Pipe Company
Birmingham, Alabama
This 106,000 sq ft design-build project for American Cast Iron Pipe Company (ACIPCO) consisted of construction of three pre-engineered metal buildings and site improvements at ACIPCO’s Vulcan Painters Facility. Prior to this project,... Read more
Hannah Steel Mill Addition
Tuscaloosa, Alabama
The design-build, pre-engineered Hanna Steel Mill expansion added 144,000 sq ft to the existing facility that was originally built in 1991. The additional manufacturing line connects to three sides (and three previous expansions) of the... Read more
Kloeckner Metals
Calvert, Alabama
Kloeckner Metals is one of the leading metal distributors in North America. This design-build project includes 87,500 sq ft of processing and coil storage bays as well as 5,500 sq ft of office space. Constructed on a 16-acre greenfield... Read more
Southern Blanking Steel Processing Facility and Expansion
Columbia, Tennessee
Brasfield & Gorrie was awarded both the new steel processing facility and an expansion to this facility. The first project was the construction of a new 108,531 sq ft steel processing facility, including a blanking line, office... Read more
Southland Tube, Inc.
Birmingham, Alabama
The 78,000 sq ft Mill 4 Expansion was a design-build project that included all site/facility planning, design phase activities, construction work, and process equipment coordination. Sixty-five percent of the work was self-performed. The... Read more
Topre America Stamping Plant Expansion
Smyrna, Tennessee
The Topre Stamping Plant project is a three-phase, single-story, 143,735 sq ft expansion that provides automotive stamping and body structure assemblies for Nissan, Honda, and Toyota. We also constructed a 53,230 sq ft stand-alone... Read more