Case Studies

A hospital surrounded by trees

How We Saved $25 Million and Six Months

July 21, 2020

Brasfield & Gorrie’s Cone Health Women’s and Children’s Center at Moses Cone Hospital project was delivered using an integrated project delivery (IPD) contract and Lean methods. The six-floor, 197,000 sq ft facility was delivered for $25 million less than the original budget and six months ahead of schedule…. Read more

Omni Louisville

Low-Cost And High-Quality Prefabrication at Omni Louisville

July 9, 2020

When Brasfield & Gorrie was hired to build the newest cultural icon in downtown Louisville, we knew from experience that using off-site prefabrication would help maximize the project’s value while minimizing its cost; it was simply a matter of determining where prefabrication would best benefit this project…. Read more

The Rebirth of Grandview Medical Center

July 1, 2015

Brasfield & Gorrie first began construction on the 13-story, 1 million sq ft hospital building in 2002, completing the mechanical, electrical, and plumbing (MEP) infrastructure and exterior shell before the project was shuttered due to the owner’s legal issues. A decade later, new owner Community Health Systems won a long-fought battle to complete the hospital and relocate Trinity Medical Center there…. Read more

Fanwall Technology for Rapid Air Handling Unit Replacement at Moses H. Cone Memorial Hospital

July 1, 2015

Because building occupants depend on conditioned air, the normally lengthy process of air handling unit (AHU) replacement can have a significant impact on occupant comfort. In hospital environments, however, where AHU functionality plays a vital role in infection control as well as comfort, fast and efficient AHU replacement can be critical. A “fast” replacement project commonly spans a week or more, with substantial impact to the affected facility…. Read more